PIE LTER zooplankton surveys using plankton tows along transects in the Plum Island Sound estuary, Massachusetts |
Anne Giblin |
2001-04-08 |
2011-08-23 |
Consumers, Estuary Water Column |
PIE LTER year 2020, meteorological data, 15 minute intervals, from the PIE LTER Marshview Farm weather station located in Newbury, MA |
Anne Giblin |
2020-01-01 |
2020-12-31 |
Climate |
PIE LTER year 2019, meteorological data, 15 minute intervals, from the PIE LTER Marshview Farm weather station located in Newbury, MA. |
Anne Giblin |
2019-01-01 |
2019-12-31 |
Climate |
PIE LTER year 2018, meteorological data, 15 minute intervals, from the PIE LTER Marshview Farm weather station located in Newbury, MA |
Anne Giblin |
2018-01-01 |
2018-12-31 |
Climate |
PIE LTER year 2018, 15 minute measurements of dissolved oxygen, water temperature in a small headwater stream draining draining a mainly forested catchment (55% forest + 19% wetland), Cart Cr., Newbury, MA. |
Wilfred Wollheim |
2018-01-01 |
2018-12-31 |
Watersheds |
PIE LTER year 2018, 15 minute measurements of dissolved oxygen, water temperature in a small headwater stream draining draining a highly suburban catchment (72% residential), Saw Mill Brook, Burlington, MA. |
Wilfred Wollheim |
2018-01-01 |
2018-11-05 |
Watersheds |
PIE LTER Year 2018, 15 minute measurements of dissolved oxygen, water temperature at the Ipswich River head of tide, Sylvania Dam in Ipswich, MA. |
Wilfred Wollheim |
2018-01-01 |
2018-12-31 |
Watersheds |
PIE LTER Year 2018, 15 minute measurements of conductivity, water temperature at the Parker River head of tide, Central St. Dam in Newbury, MA. |
Wilfred Wollheim |
2018-01-01 |
2018-12-31 |
Watersheds |
PIE LTER year 2017, 15 minute measurements of specific conductance, water temperature in a small headwater stream draining a highly suburban catchment (72% residential), Saw Mill Brook, Burlington, MA. |
Wilfred Wollheim |
2017-01-01 |
2017-12-31 |
Watersheds |
PIE LTER year 2017, 15 minute measurements of dissolved oxygen, water temperature in a small headwater stream draining draining a mainly forested catchment (55% forest + 19% wetland), Cart Cr., Newbury, MA. |
Wilfred Wollheim |
2017-01-01 |
2017-12-31 |
Watersheds |
PIE LTER Year 2017, 15 minute measurements of dissolved oxygen, water temperature at the Ipswich River head of tide, Sylvania Dam in Ipswich, MA. |
Wilfred Wollheim |
2017-01-01 |
2017-12-31 |
Watersheds |
PIE LTER year 2017, 15 minute measurements of conductivity, water temperature in a small headwater stream draining draining a mainly forested catchment (55% forest + 19% wetland), Cart Cr., Newbury, MA. |
Wilfred Wollheim |
2017-01-01 |
2017-12-31 |
Watersheds |
PIE LTER year 2017, 15 minute measurements of conductivity, water temperature in a small headwater stream draining a mainly wetland catchment (49% wetlands/swamp + 36% forest), Bear Br., draining Cedar Swamp, Reading, MA. |
Wilfred Wollheim |
2017-01-01 |
2017-12-31 |
Watersheds |
PIE LTER Year 2017, 15 minute measurements of conductivity, water temperature at the Parker River head of tide, Central St. Dam in Newbury, MA. |
Wilfred Wollheim |
2017-01-01 |
2017-12-31 |
Watersheds |
PIE LTER Year 2017, 15 minute measurements of conductivity, water temperature at the Ipswich River head of tide, Sylvania Dam in Ipswich, MA. |
Wilfred Wollheim |
2017-01-01 |
2017-12-31 |
Watersheds |
PIE LTER year 2016, 15 minute measurements of specific conductance, water temperature in a small headwater stream draining a highly suburban catchment (72% residential), Saw Mill Brook, Burlington, MA. |
Wilfred Wollheim |
2016-01-01 |
2016-12-31 |
Watersheds |
PIE LTER year 2016, 15 minute measurements of dissolved oxygen, water temperature in a small headwater stream draining draining a mainly forested catchment (55% forest + 19% wetland), Cart Cr., Newbury, MA. |
Wilfred Wollheim |
2016-01-01 |
2016-12-31 |
Watersheds |
PIE LTER Year 2016, 15 minute measurements of dissolved oxygen, water temperature at the Ipswich River head of tide, Sylvania Dam in Ipswich, MA. |
Wilfred Wollheim |
2016-01-01 |
2016-12-31 |
Watersheds |
PIE LTER year 2016, 15 minute measurements of conductivity, water temperature in a small headwater stream draining draining a mainly forested catchment (55% forest + 19% wetland), Cart Cr., Newbury, MA. |
Wilfred Wollheim |
2016-01-01 |
2016-12-31 |
Watersheds |
PIE LTER year 2016, 15 minute measurements of conductivity, water temperature in a small headwater stream draining a mainly wetland catchment (49% wetlands/swamp + 36% forest), Bear Br., draining Cedar Swamp, Reading, MA. |
Wilfred Wollheim |
2016-01-01 |
2016-12-31 |
Watersheds |
PIE LTER Year 2016, 15 minute measurements of conductivity, water temperature at the Parker River head of tide, Central St. Dam in Newbury, MA. |
Wilfred Wollheim |
2016-01-01 |
2016-12-31 |
Watersheds |
PIE LTER Year 2016, 15 minute measurements of conductivity, water temperature at the Ipswich River head of tide, Sylvania Dam in Ipswich, MA. |
Wilfred Wollheim |
2016-01-01 |
2016-12-31 |
Watersheds |
PIE LTER year 2015, 15 minute measurements of specific conductance, water temperature in a small headwater stream draining a highly suburban catchment (72% residential), Saw Mill Brook, Burlington, MA. |
Wilfred Wollheim |
2015-01-01 |
2015-12-31 |
Watersheds |
PIE LTER year 2015, 15 minute measurements of dissolved oxygen, water temperature in a small headwater stream draining draining a mainly forested catchment (55% forest + 19% wetland), Cart Cr., Newbury, MA. |
Wilfred Wollheim |
2015-01-01 |
2015-12-31 |
Watersheds |
PIE LTER Year 2015, 15 minute measurements of dissolved oxygen, water temperature at the Ipswich River head of tide, Sylvania Dam in Ipswich, MA. |
Wilfred Wollheim |
2015-01-01 |
2015-12-31 |
Watersheds |