DOI:
10.6073/pasta/ea350e307ecfdd5f01b7b74675b251f1
Data set ID:
157
Year 2006, continuous measurements, every 10, 15 or 30 minutes, were made of stage, water temperature, conductivity in a small headwater stream, Bear Meadow Brook , Cedar Swamp, Reading MA, draining a mainly wetland catchment (49% wetland + 36% wetland). Discharge is determined from stage using discharge vs stage regressions.
Publication Date:
Wednesday, December 12, 2007
Date Range:
Friday, January 6, 2006 to Sunday, December 31, 2006