DOI:
10.6073/pasta/d3c106dfafbc14ae46e55dbd084a7c68
Data set ID:
156
Year 2005,continuous measurements, every 15-30 minutes, were made of stage, water temperature, conductivity in a small headwater stream, Bear Meadow Brook , Cedar Swamp, Reading MA, draining a mainly wetland catchment (49% wetland + 36% wetland). Discharge is determined from stage using discharge vs stage regressions.
Publication Date:
Wednesday, December 12, 2007
Date Range:
Wednesday, October 12, 2005 to Thursday, December 22, 2005