DOI:
10.6073/pasta/9baf54e4636773cd363499eeb5d53272
Data set ID:
174
Year 2009, continuous measurements, every 15 minutes, were made of stage and water temperature in a small headwater stream, Bear Meadow Brook , Cedar Swamp, Reading MA, draining a mainly wetland catchment (49% wetland + 36% wetland). Discharge is determined from stage using discharge vs stage regressions.
Publication Date:
Saturday, December 12, 2009
Date Range:
Thursday, January 1, 2009 to Monday, September 28, 2009