Blocks, census, 2000, Ipswich Watershed, Parker Watershed, Plum Island Ecosystem, Massachusetts - vector |
GIS & Maps, Ipswich and Parker Watersheds |
PIE_census_blocks_vector_v1 |
Tracts, census, 2000, Ipswich Watershed, Parker Watershed, Plum Island Ecosystem, Massachusetts - vector |
GIS & Maps, Ipswich and Parker Watersheds |
PIE_census_tracts_vector_v1 |
Land use, 1999, Ipswich Watershed, Parker Watershed, Plum Island Ecosystem, Massachusetts - vector |
GIS & Maps, Ipswich and Parker Watersheds |
PIE_landuse_1999_vector_v2 |
Land use, 2005, Ipswich Watershed, Parker Watershed, Plum Island Ecosystem, Massachusetts - vector |
GIS & Maps, Ipswich and Parker Watersheds |
PIE_landuse_2005_vector_v2 |
Assessor's parcel data, Ipswich Watershed, Parker Watershed, Plum Island Ecosystem, Massachusetts - vector |
GIS & Maps, Ipswich and Parker Watersheds |
PIE_parcels_vector_v2 |
Boundary, PIE study area, Ipswich Watershed, Parker Watershed, Massachusetts - vector |
GIS & Maps, Ipswich and Parker Watersheds |
PIE_study_area_vector_v1 |
Zoning districts, Ipswich Watershed, Parker Watershed, Plum Island Ecosystem, Massachusetts - vector |
GIS & Maps, Ipswich and Parker Watersheds |
PIE_zoning_vector_v1 |
Boundary, Ipswich Watershed, Reading, Massachusetts - vector |
GIS & Maps, Ipswich Watershed |
Reading_vector |
Boundary, Ipswich Watershed, Rowley, Massachusetts - vector |
GIS & Maps, Ipswich Watershed |
Rowley_vector |
Biogeochemical rate data and sediment properties of samples used for a controlled flow through experiment testing the effect of nitrate on organic matter decomposition, PIE LTER, Plum Island Sound estuary, Massachusetts. |
Benthic Processes, Marsh, Short Term Projects |
STP-MAR-Nitrate-FlowReactorExpt |
Repeated erosion of sediments with biofilms from Rowley River mud flats, year 2012, Rowley, MA |
Short Term Projects |
STP-RO-FlumeSedimentErosion |
Sediment chlorophyll-a, pheophytin, biogenic silica, and carbohydrate content (EPS) from the Rowley River mudflat in September 2012, Rowley, MA |
Benthic Processes, Short Term Projects |
STP-RO-LENS-BEN-Chla-BSi-EPS |
Sediment profiles of dissolved oxygen and nitrous oxide along with temperature and sediment water content, Rowley River, Rowley, MA |
Benthic Processes, Short Term Projects |
STP-RO-LENS-BEN-N2O-Flux |
Water column nitrate and ammonium concentrations, sediment oxygen, di-nitrogen (gas), nitrate, nitrite, ammonium, phosphate, and silicate flux from sealed, whole core incubations, Rowley River, Rowley, MA. |
Benthic Processes, Short Term Projects |
STP-RO-LENS-BEN-NUT-Flux |
Bottom sediment, chlorophyll and pheophytin survey Plum Island Sound, Massachusetts, September 10 - 15, 2010 |
Benthic Processes, Short Term Projects |
STP-SO-sedimentchl |
July and August 2012, 10 minute interval, creek water temperature, salinity, oxygen, tidal stage and net ecosystem metabolism in Sweeney and West Creek off Rowley River, MA. |
Long Term Experiments, Tidal Creek Fertilization, Short Term Projects |
STP-TIDE-creekmetab-2012 |
Boundary, Ipswich Watershed, Tewksbury, Massachusetts - vector |
GIS & Maps, Ipswich Watershed |
Tewksbury_vector |
Boundary, Ipswich Watershed, Topsfield, Massachusetts - vector |
GIS & Maps, Ipswich Watershed |
Topsfield_vector |
PIE LTER Year 2012, 5 minute and 15 minute measurements of conductivity, water temperature at the Parker River head of tide, Central St. Dam in Newbury, MA. |
Watersheds |
WAT-CentralStDamParkerCond-2012 |
PIE LTER Year 2013, 15 minute measurements of conductivity, water temperature at the Parker River head of tide, Central St. Dam in Newbury, MA. |
Watersheds |
WAT-CentralStDamParkerCond-2013 |
PIE LTER Year 2014, 15 minute measurements of conductivity, water temperature at the Parker River head of tide, Central St. Dam in Newbury, MA. |
Watersheds |
WAT-CentralStDamParkerCond-2014 |
PIE LTER Year 2015, 15 minute measurements of conductivity, water temperature at the Parker River head of tide, Central St. Dam in Newbury, MA. |
Watersheds |
WAT-CentralStDamParkerCond-2015 |
PIE LTER Year 2016, 15 minute measurements of conductivity, water temperature at the Parker River head of tide, Central St. Dam in Newbury, MA. |
Watersheds |
WAT-CentralStDamParkerCond-2016 |
PIE LTER Year 2017, 15 minute measurements of conductivity, water temperature at the Parker River head of tide, Central St. Dam in Newbury, MA. |
Watersheds |
WAT-CentralStDamParkerCond-2017 |
PIE LTER Year 2018, 15 minute measurements of conductivity, water temperature at the Parker River head of tide, Central St. Dam in Newbury, MA. |
Watersheds |
WAT-CentralStDamParkerCond-2018 |