PIE LTER time series of methane, CO2 and N2O ebullition measurements at four headwater streams in Massachusetts and New Hampshire. |
|
WAT-PR-Newbury-CC, WAT-IP-Burlington-SB, WAT-NH-Madbury-DB, WAT-NH-Durham-CB |
Wednesday, July 28, 2021 |
PIE LTER year 2020, meteorological data, 15 minute intervals, from the PIE LTER Marshview Farm weather station located in Newbury, MA |
|
MON-PR-MFM Met Station |
Thursday, March 11, 2021 |
PIE LTER, Hach, OTT RLS measurements of water column depth at 15 minute intervals in the lower Plum Island Sound off the Ipswich Bay Yacht Club pier, Ipswich, MA, year 2020. |
|
MON-SO-IBYC Data Logger Station |
Thursday, February 4, 2021 |
PIE LTER plant species presence along vegetation transects at the Argilla Rd. salt marsh restoration site (Ipswich) and Rough Meadows reference marsh (Rowley – Stackyard Road area), Massachusetts. |
Population Dynamics |
LTE-EX-Argilla, LTE-EX-RoughMead |
Thursday, January 28, 2021 |
PIE LTER, geographic information for the transects that were set up to study the impacts on the salt marsh vegetation of nutrient enrichment from the Ipswich Wastewater Treatment Facility on Greenwood Creek in Ipswich, MA. |
Primary Production, Inorganic Nutrients, Disturbance, Population Dynamics |
LTE-TC-GreenwoodBound, MAR-LTE-RO-TC-MF-CL |
Tuesday, January 19, 2021 |
PIE LTER geographic information regarding vegetation transects set up at the Argilla Rd. Salt marsh restoration site in Ipswich and a reference marsh (Rough Meadows) in Rowley, Massachusetts. |
Population Dynamics |
LTE-EX-Argilla, LTE-EX-RoughMead |
Wednesday, January 13, 2021 |
PIE LTER plant species percent cover in quadrats along vegetation transects at the Argilla Rd. salt marsh restoration site (Ipswich) and Rough Meadows reference marsh (Rowley – Stackyard Road area), Massachusetts. |
Population Dynamics |
LTE-EX-Argilla, LTE-EX-RoughMead |
Wednesday, January 13, 2021 |
PIE LTER, Year 2019, 15 minute interval, water quality measurements of water column temperature, salinity, oxygen, and depth near the mouth of Plum Island Sound, Massachusetts |
Primary Production, Organic Matter, Disturbance |
MON-SO-IBYC Data Logger Station |
Tuesday, January 12, 2021 |
PIE LTER, year 2018, 15 minute measurements of stage in a small headwater stream draining a highly suburban catchment (72% residential), Saw Mill Brook, Burlington, MA. |
Disturbance |
WAT-IP-Burlington-SB |
Monday, January 11, 2021 |
PIE LTER, year 2017, 15 minute measurements of stage in a small headwater stream draining a highly suburban catchment (72% residential), Saw Mill Brook, Burlington, MA. |
Disturbance |
WAT-IP-Burlington-SB |
Monday, January 11, 2021 |
PIE LTER, Year 2016, 15 minute measurements of stage in a small headwater stream draining a highly suburban catchment (72% residential), Saw Mill Brook, Burlington, MA. |
Disturbance |
WAT-IP-Burlington-SB |
Friday, December 4, 2020 |
Year 2018, 15 minute measurements of stage, water temperature in a small headwater stream draining a mainly wetland catchment (49% wetlands/swamp + 36% forest), Bear Meadow Brook, draining Cedar Swamp, Reading, MA. |
Disturbance |
WAT-IP-Reading-CS |
Thursday, December 3, 2020 |
Year 2017, 15 minute measurements of stage, water temperature in a small headwater stream draining a mainly wetland catchment (49% wetlands/swamp + 36% forest), Bear Meadow Brook, draining Cedar Swamp, Reading, MA. |
Disturbance |
WAT-IP-Reading-CS |
Thursday, December 3, 2020 |
Year 2016, 15 minute measurements of stage, water temperature in a small headwater stream draining a mainly wetland catchment (49% wetlands/swamp + 36% forest), Bear Meadow Brook, draining Cedar Swamp, Reading, MA. |
Disturbance |
WAT-IP-Reading-CS |
Thursday, December 3, 2020 |
Year 2018, 15 minute measurements of stage, water temperature in a small headwater stream draining draining a mainly forested catchment (55% forest + 19% wetland), Cart Cr., Newbury, MA. |
Disturbance |
WAT-PR-Newbury-CC |
Wednesday, December 2, 2020 |
Year 2017, 15 minute measurements of stage, water temperature in a small headwater stream draining draining a mainly forested catchment (55% forest + 19% wetland), Cart Cr., Newbury, MA. |
Disturbance |
WAT-PR-Newbury-CC |
Wednesday, December 2, 2020 |
Year 2016, 15 minute measurements of stage, water temperature in a small headwater stream draining draining a mainly forested catchment (55% forest + 19% wetland), Cart Cr., Newbury, MA. |
Disturbance |
WAT-PR-Newbury-CC |
Wednesday, December 2, 2020 |
PIE LTER year 2018, 15 minute measurements of dissolved oxygen, water temperature in a small headwater stream draining draining a highly suburban catchment (72% residential), Saw Mill Brook, Burlington, MA. |
Disturbance |
WAT-IP-Burlington-SB |
Wednesday, December 2, 2020 |
PIE LTER abundances of macroalgae and Ruppia maritima in six high marsh ponds, Rowley, MA, during the summer of 2016. |
Population Dynamics |
MAR-WE-SH-HighMarshPond1, MAR-LP-HighMarshPond2, MAR-SH-HighMarshPond3, MAR-WE-SH-HighMarshPond4, MAR-SH-HighMarshPond5, MAR-LP-HighMarshPond6 |
Tuesday, August 18, 2020 |
PIE LTER 15-minute surface water dissolved oxygen, temperature, and salinity of six high marsh ponds, Rowley, MA, during the summer of 2016. |
Primary Production |
MAR-WE-SH-HighMarshPond1, MAR-LP-HighMarshPond2, MAR-SH-HighMarshPond3, MAR-WE-SH-HighMarshPond4, MAR-SH-HighMarshPond5, MAR-LP-HighMarshPond6 |
Tuesday, August 18, 2020 |
PIE LTER chlorophyll concentrations in the surface waters and sediments of six high marsh ponds, Rowley, MA, during the summer of 2016. |
Primary Production |
MAR-WE-SH-HighMarshPond1, MAR-LP-HighMarshPond2, MAR-SH-HighMarshPond3, MAR-WE-SH-HighMarshPond4, MAR-SH-HighMarshPond5, MAR-LP-HighMarshPond6 |
Tuesday, August 18, 2020 |
PIE LTER diel surface water chemistry of two high marsh ponds, Rowley, MA, during the summer of 2016. |
Organic Matter, Inorganic Nutrients |
MAR-WE-SH-HighMarshPond1, MAR-WE-SH-HighMarshPond4 |
Wednesday, July 1, 2020 |
PIE LTER suspended sediments at Law's Point, West Creek, a tidal marsh and creek off the Rowley River, Rowley, MA, during 2016-2017. |
|
EST-TC-West-LP-channel, EST-TC-West-LP-MarshEdge_1.25, EST-TC-West-LP-MarshEdge_2.7, EST-TC-West-LP-MarshInterior_9.3, EST-TC-West-LP-MarshInterior_17, EST-TC-West-LP-MarshInterior_24 |
Friday, May 22, 2020 |
PIE LTER site names and locations associated with synoptically sampled study sites within the Parker and Ipswich watersheds, Massachusetts. |
Inorganic Nutrients |
Ipswich River Watershed Bounding Box, Parker River Watershed Bounding Box |
Friday, May 15, 2020 |
PIE LTER nutrient grab samples collected between December 1998 and July 2017 in the mainstem, tributaries, and headwater streams in the Ipswich and Parker River watersheds, Massachusetts. |
Inorganic Nutrients |
Ipswich River Watershed Bounding Box, Parker River Watershed Bounding Box |
Friday, May 15, 2020 |