Data Catalog by Research Sites

514 matching data sets (displaying 1 - 25)
Title Core areas Related sites
PIE LTER, geographic information for the transects that were set up to study the impacts on the salt marsh vegetation of nutrient enrichment from the Ipswich Wastewater Treatment Facility on Greenwood Creek in Ipswich, MA. Primary Production, Inorganic Nutrients, Disturbance, Population Dynamics
PIE LTER geographic information regarding vegetation transects set up at the Argilla Rd. Salt marsh restoration site in Ipswich and a reference marsh (Rough Meadows) in Rowley, Massachusetts. Population Dynamics
PIE LTER plant species percent cover in quadrats along vegetation transects at the Argilla Rd. salt marsh restoration site (Ipswich) and Rough Meadows reference marsh (Rowley – Stackyard Road area), Massachusetts. Population Dynamics
PIE LTER, Year 2019, 15 minute interval, water quality measurements of water column temperature, salinity, oxygen, and depth near the mouth of Plum Island Sound, Massachusetts Primary Production, Organic Matter, Disturbance
PIE LTER, year 2018, 15 minute measurements of stage in a small headwater stream draining a highly suburban catchment (72% residential), Saw Mill Brook, Burlington, MA. Disturbance
PIE LTER, year 2017, 15 minute measurements of stage in a small headwater stream draining a highly suburban catchment (72% residential), Saw Mill Brook, Burlington, MA. Disturbance
PIE LTER, Year 2016, 15 minute measurements of stage in a small headwater stream draining a highly suburban catchment (72% residential), Saw Mill Brook, Burlington, MA. Disturbance
Year 2018, 15 minute measurements of stage, water temperature in a small headwater stream draining a mainly wetland catchment (49% wetlands/swamp + 36% forest), Bear Meadow Brook, draining Cedar Swamp, Reading, MA. Disturbance
Year 2017, 15 minute measurements of stage, water temperature in a small headwater stream draining a mainly wetland catchment (49% wetlands/swamp + 36% forest), Bear Meadow Brook, draining Cedar Swamp, Reading, MA. Disturbance
Year 2016, 15 minute measurements of stage, water temperature in a small headwater stream draining a mainly wetland catchment (49% wetlands/swamp + 36% forest), Bear Meadow Brook, draining Cedar Swamp, Reading, MA. Disturbance
Year 2018, 15 minute measurements of stage, water temperature in a small headwater stream draining draining a mainly forested catchment (55% forest + 19% wetland), Cart Cr., Newbury, MA. Disturbance
Year 2017, 15 minute measurements of stage, water temperature in a small headwater stream draining draining a mainly forested catchment (55% forest + 19% wetland), Cart Cr., Newbury, MA. Disturbance
Year 2016, 15 minute measurements of stage, water temperature in a small headwater stream draining draining a mainly forested catchment (55% forest + 19% wetland), Cart Cr., Newbury, MA. Disturbance
PIE LTER year 2018, 15 minute measurements of dissolved oxygen, water temperature in a small headwater stream draining draining a highly suburban catchment (72% residential), Saw Mill Brook, Burlington, MA. Disturbance
PIE LTER abundances of macroalgae and Ruppia maritima in six high marsh ponds, Rowley, MA, during the summer of 2016. Population Dynamics
PIE LTER 15-minute surface water dissolved oxygen, temperature, and salinity of six high marsh ponds, Rowley, MA, during the summer of 2016. Primary Production
PIE LTER chlorophyll concentrations in the surface waters and sediments of six high marsh ponds, Rowley, MA, during the summer of 2016. Primary Production
PIE LTER diel surface water chemistry of two high marsh ponds, Rowley, MA, during the summer of 2016. Organic Matter, Inorganic Nutrients
PIE LTER suspended sediments at Law's Point, West Creek, a tidal marsh and creek off the Rowley River, Rowley, MA, during 2016-2017.
PIE LTER site names and locations associated with synoptically sampled study sites within the Parker and Ipswich watersheds, Massachusetts. Inorganic Nutrients
PIE LTER nutrient grab samples collected between December 1998 and July 2017 in the mainstem, tributaries, and headwater streams in the Ipswich and Parker River watersheds, Massachusetts. Inorganic Nutrients
Year 2019, PIE LTER wind sensor data, 15 minute intervals, from the Ipswich Bay Yacht Club pier located in Ipswich, MA
PIE LTER year 2019, meteorological data, 15 minute intervals, from the PIE LTER Marshview Farm weather station located in Newbury, MA.
PIE LTER, Hach, OTT RLS measurements of water column depth at 15 minute intervals in the lower Plum Island Sound off the Ipswich Bay Yacht Club pier, Ipswich, MA, year 2019.
Fiddler crab body size in salt marshes from Florida to Massachusetts, USA at PIE and VCR LTER and NOAA NERR sites during summer 2016. Population Dynamics

Pages