Data Catalog

568 matching data sets (displaying 376 - 400)
Title Authors Start Date End Datesort descending Research Areas
Year 2012, wind sensor data, 15 minute intervals, from the Ipswich Bay Yacht Club pier located in Ipswich, MA Anne Giblin 2012-01-01 2012-12-31 Climate
Eddy flux measurements during 2012 from high marsh (Spartina patens/short Spartina alterniflora) off Nelson Island Creek, Rowley, Massachusetts Anne Giblin, Inke Forbrich 2012-01-01 2012-12-31 Marsh
Marsh water table height, logging data from the railroad Spartina marsh site on the Parker River for April-November 2012. Anne Giblin 2012-04-03 2012-11-14 Marsh
Year 2012, 15 minute interval, water quality measurements of water column temperature, salinity, oxygen, and depth near the mouth of Plum Island Sound, Massachusetts 2012-04-03 2012-12-03 Estuary Water Column
Marsh water table height, logging data from the Typha marsh site on the upper Parker River for April-November 2012. Anne Giblin 2012-04-05 2012-11-14 Marsh
Surveys of salt marsh wading birds and shorebirds in Massachusetts at Plum Island Sound, PIE LTER and portions of Essex Bay Robert Buchsbaum 2012-05-25 2018-09-07 Consumers
Monthly small nekton samplings collected in the Plum Island Estuary, years 2012-2014 Linda Deegan, James Nelson 2012-06-01 2014-10-02 Consumers
Repeated erosion of sediments with biofilms from Rowley River mud flats, year 2012, Rowley, MA Sergio Fagherazzi 2012-07-01 2012-07-26 Short Term Projects
July and August 2012, 10 minute interval, creek water temperature, salinity, oxygen, tidal stage and net ecosystem metabolism in Sweeney and West Creek off Rowley River, MA. Linda Deegan 2012-07-27 2012-08-15 Long Term Experiments, Tidal Creek Fertilization, Short Term Projects
Sediment chlorophyll-a, pheophytin, biogenic silica, and carbohydrate content (EPS) from the Rowley River mudflat in September 2012, Rowley, MA Sergio Fagherazzi 2012-09-12 2012-09-26 Benthic Processes, Short Term Projects
Sediment profiles of dissolved oxygen and nitrous oxide along with temperature and sediment water content, Rowley River, Rowley, MA 2012-09-12 2012-09-26 Benthic Processes, Short Term Projects
Water column nitrate and ammonium concentrations, sediment oxygen, di-nitrogen (gas), nitrate, nitrite, ammonium, phosphate, and silicate flux from sealed, whole core incubations, Rowley River, Rowley, MA. Sergio Fagherazzi 2012-09-12 2012-09-26 Benthic Processes, Short Term Projects
PIE LTER year 2012, 5 minute and 15 minute measurements of specific conductance, water temperature in a small headwater stream draining a highly suburban catchment (72% residential), Saw Mill Brook, Burlington, MA. Wilfred Wollheim 2012-11-30 2012-12-31 Watersheds
PIE LTER year 2012, 5 minute and 15 minute measurements of conductivity, water temperature in a small headwater stream draining a mainly wetland catchment (49% wetlands/swamp + 36% forest), Bear Br., draining Cedar Swamp, Reading, MA. Wilfred Wollheim 2012-11-30 2012-12-31 Watersheds
PIE LTER Year 2012, 5 minute and 15 minute measurements of conductivity, water temperature at the Parker River head of tide, Central St. Dam in Newbury, MA. Wilfred Wollheim 2012-11-30 2012-12-31 Watersheds
PIE LTER Year 2012, 5 minute and 15 minute measurements of conductivity, water temperature at the Ipswich River head of tide, Sylvania Dam in Ipswich, MA. Wilfred Wollheim 2012-11-30 2012-12-31 Watersheds
PIE LTER year 2012, 5 minute and 15 minute measurements of conductivity, water temperature in a small headwater stream draining draining a mainly forested catchment (55% forest + 19% wetland), Cart Cr., Newbury, MA. Wilfred Wollheim 2012-11-30 2012-12-31 Watersheds
Year 2013, 15 minute measurements of stage, water temperature in a small headwater stream draining draining a mainly forested catchment (55% forest + 19% wetland), Cart Cr., Newbury, MA. Wilfred Wollheim 2013-01-01 2013-12-31 Watersheds
PIE LTER year 2013, 15 minute measurements of specific conductance, water temperature in a small headwater stream draining a highly suburban catchment (72% residential), Saw Mill Brook, Burlington, MA. Wilfred Wollheim 2013-01-01 2013-12-31 Watersheds
Year 2013, 15 minute measurements of stage, water temperature in a small headwater stream draining a mainly wetland catchment (49% wetlands/swamp + 36% forest), Bear Meadow Brook, draining Cedar Swamp, Reading, MA. Wilfred Wollheim 2013-01-01 2013-12-31 Watersheds
Year 2013, meteorological data, 15 minute intervals, from the Marshview Farm weather station located in Newbury, MA Anne Giblin 2013-01-01 2014-12-31 Climate
PIE LTER year 2013, 15 minute measurements of conductivity, water temperature in a small headwater stream draining a mainly wetland catchment (49% wetlands/swamp + 36% forest), Bear Br., draining Cedar Swamp, Reading, MA. Wilfred Wollheim 2013-01-01 2013-12-31 Watersheds
PIE LTER eddy flux measurements during 2013 from second high marsh site (Spartina patens/short Spartina alterniflora) Tall Tower off Nelson Island Creek, Rowley, Massachusetts Anne Giblin, Inke Forbrich 2013-01-01 2013-12-31 Marsh
PIE LTER Year 2013, 15 minute measurements of conductivity, water temperature at the Parker River head of tide, Central St. Dam in Newbury, MA. Wilfred Wollheim 2013-01-01 2013-12-31 Watersheds
Year 2013, 15 minute measurements of stage in a small headwater stream draining a highly suburban catchment (72% residential), Saw Mill Brook, Burlington, MA. Wilfred Wollheim 2013-01-01 2013-12-31 Watersheds

Pages