PIE LTER transects of the Parker River Plum Island Sound Estuary, Massachusetts conducted at dawn and dusk, containing dissolved oxygen, conductivity, temperature, percent saturation, pH, DIC and pCO2 data. |
Nathaniel Weston |
1995-06-27 |
2019-10-20 |
Estuary Water Column |
PIE LTER time series of nutrient grab samples from Ipswich River and Parker River watershed catchments, Masachusetts, with frequency ranging from weekly to monthly between 2001 and 2019. |
Wilfred Wollheim |
2001-06-12 |
2019-08-01 |
Watersheds |
PIE LTER time series of methane, CO2 and N2O ebullition measurements at four headwater streams in Massachusetts and New Hampshire. |
Wilfred Wollheim |
2018-07-01 |
2019-11-01 |
Watersheds |
PIE LTER suspended sediments at Law's Point, West Creek, a tidal marsh and creek off the Rowley River, Rowley, MA, during 2016-2017. |
|
2016-05-18 |
2017-09-19 |
Estuary Water Column, Marsh |
PIE LTER surveys of salt marsh breeding birds using point counts in Rowley and Newbury, Massachusetts |
Robert Buchsbaum |
2004-06-09 |
2021-06-28 |
Consumers |
PIE LTER surface elevation table (SET) raw data from six marsh sites along the Rowley River, MA. |
Anne Giblin |
2002-09-23 |
2021-09-21 |
Marsh |
PIE LTER study of marsh vegetation percent cover at Greenwood Creek, Ipswich, MA effluent enrichment and Clubhead Creek, Rowley, MA reference sites |
Robert Buchsbaum |
2002-09-19 |
2002-10-17 |
Long Term Experiments, Marsh Fertilization - Greenwood Creek |
PIE LTER study of marsh vegetation percent cover and biomass at the end of the growing season at Greenwood Creek, Ipswich, MA effluent enrichment and Clubhead Creek, Rowley, MA reference sites |
Robert Buchsbaum |
2002-09-19 |
2002-10-07 |
Long Term Experiments, Marsh Fertilization - Greenwood Creek |
PIE LTER stream chemistry characteristics studied for methane ebullition at four headwater streams in Massachusetts and New Hampshire. |
Wilfred Wollheim |
2018-07-01 |
2019-08-31 |
Watersheds |
PIE LTER site names and locations associated with synoptically sampled study sites within the Parker and Ipswich watersheds, Massachusetts. |
Wilfred Wollheim |
1998-12-07 |
2017-07-04 |
Watersheds |
PIE LTER salt marsh vegetation zones along transects in Rowley, MA |
Robert Buchsbaum |
2000-08-07 |
2020-09-28 |
Marsh, Long Term Experiments, Marsh Detritus Removal |
PIE LTER salt marsh vegetation frequency of occurrence from regularly monitored transects in Rowley, MA |
Robert Buchsbaum |
2000-08-07 |
2020-09-28 |
Marsh, Long Term Experiments, Marsh Detritus Removal |
PIE LTER salt marsh vegetation cover data from regularly monitored quadrats along transects in Rowley, MA. |
Robert Buchsbaum |
2000-08-07 |
2020-09-29 |
Marsh, Long Term Experiments, Marsh Detritus Removal |
PIE LTER quadrat percent cover associated with marsh sites used in space for time sea level rise study, Rowley, MA. |
Jarrett Byrnes |
2017-06-01 |
2021-09-01 |
Consumers, Marsh, Space for Time |
PIE LTER predation and herbivory rates associated with marsh sites used in space for time sea level rise study, Rowley, MA. |
Jarrett Byrnes |
2017-06-01 |
2018-08-01 |
Consumers, Marsh, Long Term Experiments, Space for Time |
PIE LTER plant species presence along vegetation transects at the Argilla Rd. salt marsh restoration site (Ipswich) and Rough Meadows reference marsh (Rowley – Stackyard Road area), Massachusetts. |
Robert Buchsbaum |
1995-01-01 |
2002-12-31 |
Marsh, Long Term Experiments |
PIE LTER plant species percent cover in quadrats along vegetation transects at the Argilla Rd. salt marsh restoration site (Ipswich) and Rough Meadows reference marsh (Rowley – Stackyard Road area), Massachusetts. |
Robert Buchsbaum |
1999-01-01 |
2002-01-01 |
Marsh, Long Term Experiments |
PIE LTER plant biomass associated with marsh sites used in space for time sea level rise study, Rowley, MA. |
Jarrett Byrnes |
2017-06-01 |
2018-09-01 |
Consumers, Marsh, Long Term Experiments, Space for Time |
PIE LTER nutrient samples collected by Sigma Autosampler between 2001 and 2019 in three headwater sites of contrasting land use, and at the Parker and Ipswich River Dams as they enter into the Plum Island Sound estuary, Massachusetts. |
Wilfred Wollheim |
2001-10-25 |
2019-12-09 |
Watersheds |
PIE LTER nutrient grab samples collected between December 1998 and July 2017 in the mainstem, tributaries, and headwater streams in the Ipswich and Parker River watersheds, Massachusetts. |
Wilfred Wollheim |
1998-12-07 |
2017-07-04 |
Watersheds |
PIE LTER Methane isotopes (13C and D) for methane in sediments and dissolved in surface water from four headwater streams in Massachusetts and New Hampshire. |
Wilfred Wollheim |
2018-08-23 |
2019-08-09 |
Watersheds |
PIE LTER measurements of water column depth at 15 minute intervals in the Parker River near Rt 1A bridge, Newbury, MA, year 2002. Water depths are relative to the sonde pressure transducer and not associated with a datum. |
Joe Vallino |
2002-04-11 |
2002-12-05 |
Estuarine Physics |
PIE LTER measurements of water column depth at 15 minute intervals in the Parker River near Rt 1A bridge, Newbury, MA, year 2001. Water depths are relative to the sonde pressure transducer and not associated with a datum. |
Joe Vallino |
2001-05-31 |
2001-12-25 |
Estuarine Physics |
PIE LTER measurements of water column depth at 15 minute intervals in the Parker River near Rt 1A bridge, Newbury, MA, year 2000. Water depths are relative to the sonde pressure transducer and not associated with a datum. |
Joe Vallino |
2000-04-24 |
2000-11-21 |
Estuarine Physics |
PIE LTER measurements of the two tallest Phragmites australis stems per five meter interval along transects at the Argilla Rd. salt marsh restoration site (Ipswich, MA) and Rough Meadows reference marsh (Rowley, MA – Stackyard Road area). |
Robert Buchsbaum |
1997-06-19 |
2002-06-24 |
Marsh, Long Term Experiments |